For preconstruction leaders
Every package reviewed the same way, whoever ran it
Right now the depth of a bid review depends on which estimator had the package and how much time was left. Consight makes the method repeatable so the standard holds across the team.

For preconstruction leaders
Every package reviewed the same way, whoever ran it
Right now the depth of a bid review depends on which estimator had the package and how much time was left. Consight makes the method repeatable so the standard holds across the team.

For preconstruction leaders
Every package reviewed the same way, whoever ran it
Right now the depth of a bid review depends on which estimator had the package and how much time was left. Consight makes the method repeatable so the standard holds across the team.

Department level
What changes when leveling is a process, not a habit
One scope sheet standard across the team
The same leveling method on every package
Exclusions reviewed instead of skimmed
Coverage gaps visible before award
A record of what each bidder actually carried
New estimators productive sooner
Capacity for more pursuits per estimator
Bid tabs the owner can follow
Fewer scope surprises after buyout
Department level
What changes when leveling is a process, not a habit
One scope sheet standard across the team
The same leveling method on every package
Exclusions reviewed instead of skimmed
Coverage gaps visible before award
A record of what each bidder actually carried
New estimators productive sooner
Capacity for more pursuits per estimator
Bid tabs the owner can follow
Fewer scope surprises after buyout
Department level
What changes when leveling is a process, not a habit
One scope sheet standard across the team
The same leveling method on every package
Exclusions reviewed instead of skimmed
Coverage gaps visible before award
A record of what each bidder actually carried
New estimators productive sooner
Capacity for more pursuits per estimator
Bid tabs the owner can follow
Fewer scope surprises after buyout
Repeatability
The method travels with the process, not the person
When your strongest estimator is out, the package still gets reviewed the same way. The scope sheet, the checks, and the flags do not change based on who opened the file.
See bid reports

Repeatability
The method travels with the process, not the person
When your strongest estimator is out, the package still gets reviewed the same way. The scope sheet, the checks, and the flags do not change based on who opened the file.
See bid reports

Repeatability
The method travels with the process, not the person
When your strongest estimator is out, the package still gets reviewed the same way. The scope sheet, the checks, and the flags do not change based on who opened the file.
See bid reports

How it works
Making review repeatable
01
Standardize the scope sheet
Agree once on how a package is broken out, and reuse it across jobs and estimators.
02
Run every package through it
Bids get leveled the same way whether it is a small trade or the biggest package on the job.
03
Review by exception
Look at what is flagged — gaps, outliers, thin coverage — instead of re-reading every tab.
04
Keep the record
What each bidder carried, what was adjusted, and why stays with the job after award.
How it works
Making review repeatable
01
Standardize the scope sheet
Agree once on how a package is broken out, and reuse it across jobs and estimators.
02
Run every package through it
Bids get leveled the same way whether it is a small trade or the biggest package on the job.
03
Review by exception
Look at what is flagged — gaps, outliers, thin coverage — instead of re-reading every tab.
04
Keep the record
What each bidder carried, what was adjusted, and why stays with the job after award.
How it works
Making review repeatable
01
Standardize the scope sheet
Agree once on how a package is broken out, and reuse it across jobs and estimators.
02
Run every package through it
Bids get leveled the same way whether it is a small trade or the biggest package on the job.
03
Review by exception
Look at what is flagged — gaps, outliers, thin coverage — instead of re-reading every tab.
04
Keep the record
What each bidder carried, what was adjusted, and why stays with the job after award.
Across the team
What consistency actually buys you
Estimator by estimator
One shared method
How a package gets broken out
Depends who set up the tab
One scope sheet standard everyone works from
Depth of review
Depends how much time was left
The same checks run on every package
Onboarding a new estimator
Learn one senior person's system
Learn the process once and apply it everywhere
Reviewing a team member's work
Reopen their file and rebuild the logic
Open the sheet and see the flags and sources
Risk after award
Scope gaps show up as change orders
Gaps surfaced and resolved before buyout
Adding pursuits
Hire, or push the team harder
More packages per estimator without cutting review
Across the team
What consistency actually buys you
Estimator by estimator
One shared method
How a package gets broken out
Depends who set up the tab
One scope sheet standard everyone works from
Depth of review
Depends how much time was left
The same checks run on every package
Onboarding a new estimator
Learn one senior person's system
Learn the process once and apply it everywhere
Reviewing a team member's work
Reopen their file and rebuild the logic
Open the sheet and see the flags and sources
Risk after award
Scope gaps show up as change orders
Gaps surfaced and resolved before buyout
Adding pursuits
Hire, or push the team harder
More packages per estimator without cutting review
Across the team
What consistency actually buys you
How a package gets broken out
Estimator by estimator
Depends who set up the tab
One shared method
One scope sheet standard everyone works from
Depth of review
Estimator by estimator
Depends how much time was left
One shared method
The same checks run on every package
Onboarding a new estimator
Estimator by estimator
Learn one senior person's system
One shared method
Learn the process once and apply it everywhere
Reviewing a team member's work
Estimator by estimator
Reopen their file and rebuild the logic
One shared method
Open the sheet and see the flags and sources
Risk after award
Estimator by estimator
Scope gaps show up as change orders
One shared method
Gaps surfaced and resolved before buyout
Adding pursuits
Estimator by estimator
Hire, or push the team harder
One shared method
More packages per estimator without cutting review
Where the risk lives
The expensive mistakes happen before the job starts
A missed exclusion in a small package does not stay a small problem. Catching coverage gaps during leveling is the cheapest place on the whole job to find them.
See scope generation

Where the risk lives
The expensive mistakes happen before the job starts
A missed exclusion in a small package does not stay a small problem. Catching coverage gaps during leveling is the cheapest place on the whole job to find them.
See scope generation

Where the risk lives
The expensive mistakes happen before the job starts
A missed exclusion in a small package does not stay a small problem. Catching coverage gaps during leveling is the cheapest place on the whole job to find them.
See scope generation

“
Consight gives our team a more consistent way to catch scope gaps before award.
Hennie van Niekerk, Preconstruction Manager






“
Consight gives our team a more consistent way to catch scope gaps before award.
Hennie van Niekerk, Preconstruction Manager






“
Consight gives our team a more consistent way to catch scope gaps before award.
Hennie van Niekerk, Preconstruction Manager






Questions from preconstruction leaders
How do we roll this out without disrupting a live bid?
Will estimators push back?
Can I see how a package was reviewed after the fact?
Does this replace our estimating system?
How does this affect capacity?
What about the trades that always bid incomplete?
Questions from preconstruction leaders
How do we roll this out without disrupting a live bid?
Will estimators push back?
Can I see how a package was reviewed after the fact?
Does this replace our estimating system?
How does this affect capacity?
What about the trades that always bid incomplete?
Questions from preconstruction leaders
How do we roll this out without disrupting a live bid?
Will estimators push back?
Can I see how a package was reviewed after the fact?
Does this replace our estimating system?
How does this affect capacity?
What about the trades that always bid incomplete?
Make good bid review the default.
Talk to sales
Make good bid review the default.
Talk to sales